One of the most common questions homeowners ask before booking a tiler is how long the job will take. The answer depends on room size, tile type, surface preparation and whether the tiler is working alone or with a team.
Typical Tiling Timescales
| Job | Typical Time |
|---|---|
| Kitchen splashback | Half a day |
| Small bathroom floor only | 1 day |
| Medium bathroom (floor and walls) | 2-3 days |
| Full bathroom retile | 3-5 days |
| Wet room | 4-6 days |
| Kitchen floor (15-20m2) | 1-2 days |
| Patio (20-40m2) | 2-4 days |
Why Grout Drying Time Matters
Once tiles are laid, adhesive typically needs 24-48 hours to cure before grouting can begin, and grout needs a further 24 hours before the area can be used.
Large Format Tiles Take Longer
Large-format tiles (60x60cm and above) require more careful laying and often a self-levelling compound. A job that takes two days in standard ceramic can take three to four days in large-format porcelain.
Plan Around the Tiler Schedule
To get an accurate timeline for your specific project, get a quote from a local tiler and discuss the schedule in detail before booking.